Last month I took the opportunity to cycle along the Leeds-Bradford cycle superhighway, kindly escorted by Martin Stanley of Leeds Cycling Campaign. While London’s cycling new infrastructure is hitting the headlines, there are other projects taking place elsewhere in the country, of which this is one of the more high profile (albeit for perhaps not all the right reasons).
Indeed, I did go with very low expectations – I’d seen the pictures being shared on social media and on blogs of what can only be described as very poor infrastructure. And it has to be said that the route between the two cities is not of a high quality, certainly nowhere near as high as the routes being built in London. Perhaps a lower level of quality might be expected given the lower level of expertise and investment, along with some ‘higher order’ problems we’ll come to in this post. But what was particularly frustrating for me wasn’t actually the low quality. It was the inconsistency. Some sections have been built and designed reasonably well. But other sections – dealing with identical problems – have been bodged, and bodged badly, which left me wondering why a more consistent level of quality couldn’t have been achieved.
We’ll come to these issues, and others, in the post, but all the same I did come away from the day cycling to Bradford and back feeling a little positive. This was, perhaps, just because the sun had come out in the afternoon, on what had started as a miserable day. But mainly I think it was because, despite all the flaws of this northern ‘superhighway’, I had managed to travel by bike between the two cities in some comfort, and with a reasonable degree of safety. Roads that I wouldn’t even have considered cycling on for pleasure, and would have struggled to justify cycling on for practical purposes – fast, busy roads – now have somewhere that it feels safe and comfortable to cycle, for the most part, and for all the flaws. That means cycling is a possibility, not just for more confident types like me, but for everyone else.
Despite the route only just having opened – and despite the bad weather earlier in the day – we did see people starting to use the cycling infrastructure. Not in huge numbers, admittedly, but enough to indicate that there is potential to shift and change behaviour, and the way people travel about.

So, the good news is that there is now a long route consisting almost entirely of protected infrastructure, that could open up cycling as a mode of transport for ordinary people.
The bad news, however, is that the quality is patchy, and in places actually quite dangerous. As I’ve mentioned already, the frustrating thing is the inconsistency, in that good design and build quality was interspersed with bad. I’m not sure why this was the case; it might be the inevitable consequence of having to build what amounts to quite a long route from A to B in a short space of time, with a fixed budget, starting essentially from a very low base in terms of experience, knowledge and expertise in building cycling infrastructure – a problem I suspect that is pervasive across Britain, just because there is so little good stuff, and so few people building it. It also seems to stem from what I have heard is a reluctance to impinge on driving in any way along this route, which means that compromises on quality will be inevitable.
The reluctance to give even an inch to cycling from motoring led in many places to quite comical outcomes.
The photograph shows that, alongside a six-lane road for motor traffic, not only will users have to swerve around traffic light posts right in the middle of the cycleway, they will then have to deal with a ‘door zone’ (indicated by the pale surfacing) created by new parking bays installed on the road – parking bays that didn’t exist before, and that, if in use, will actually block in people parking legitimately off the carriageway. In the context of such an enormous road this is very thin gruel indeed, especially when we consider that on the opposite side we have to put up with just a shared use footway.

The bus stop bypasses are definitely one of the more serious problems. Some of them are again just comically bad, absurdly narrow for one-way cycling, let alone two-way cycling.

Yes, that is a two-way cycleway
At one of these stops, I heard a couple of men waiting fora bus grumbling about how ‘they hate cyclists – they’re even on the pavement now’ as we rolled past, and it was easy to understand the source of their annoyance, given that we were almost trundling on their toes, by design.

In most of these cases, the failure to design a proper bus stop bypass, with adequate space for all users, seems to have flowed either from the aforementioned reluctance to take any space from motor traffic, or to spend any money adjusting kerb lines, or both – with, frankly, very silly results.

That’s just one lane of motor traffic on the right, heading away from the camera. The ‘bypass’ is at most 18 inches wide
The surfacing was also frustratingly bad. While very smooth in many places, other sections had a dreadful surface, that looked like it had been shovelled in and patted down – usually next to a beautifully smooth road surface.

The rain earlier in the day was at least helpful in showing up surface deficiencies
Why could some parts be surfaced well, and others not? Did some contractors just not care?
Another problem with inconsistency – and a more dangerous one – is the design of many of the side road treatments, where the cycleway (either in uni-directional, or bi-directional form) crosses side roads. This was where the inconsistency was particularly stark. Some were designed reasonably well, with at least some degree of visual continuity, and the kerbs only stopping at the junction, ensuring that the geometry for drivers is reasonably tight.


But far too many junctions appear to have adopted a design technique that involves simply stopping the kerbs some 20 or 30 metres before the junction, dumping you out onto a cycle lane, which felt horribly exposed.

This is, I suspect, the dead hand of LTN 2/08 informing design, with its recommendation that cyclists should be ‘reintroduced to the main road’ before a junction, passing the junction ‘on the carriageway’. Presumably the intention is to ‘reintegrate’ anyone cycling with motor traffic before the junction, but in reality no ‘reintegration’ or ‘reintroduction’ will take place. You are just left at the side of the road with no engineering or design to slow or modify the behaviour of drivers turning across your path. It’s bad, and dangerous, we simply shouldn’t be building junctions like this in 2016. We need continuity, clear priority, and design that slows drivers, and makes them careful. Not this.

There are other (admittedly less serious) problems with visual continuity at side roads. Treatments that could work well are undermined by markings that still suggest people cycling should yield, when they shouldn’t.

Double yellows, the green paint and the kerb line all remove any visual continuity and priority for cycling

The same problem again. Note that this is an exit-only side road
Other mistakes point to a lack of experience in how to design for cycling. One stood out for me, shown in the photograph below.

Here the cycleway (on the right) could merge into the cul-de-sac, a low traffic environment that could very easily form part of the route. Yet instead the designers have opted to continue the cycleway on a tiny, thin stretch of pavement on the right, sandwiched between parked cars and fast motor traffic only a few feet to the right.
Signs telling you where to go are helpful – but not when they are positioned right in the middle of where you actually want to cycle.

Again, this points to a lack of experience in considering the specific needs and requirements of cycling as mode of transport, along with designing a cycleway that bumps up and down for every single residential entrance, leaving a corrugated cycleway!

One final, major problem is the town centre of Stanningley, about halfway along the route. Here there simply isn’t room for cycling infrastructure, so in brute terms the town has a motor traffic problem. There’s too much motor traffic on the high street, especially given the town has a bypass.
This motor traffic problem hasn’t been resolved. Instead the road through the town has been given a nice new gravel-infused tarmac surface (tellingly, the smoothest tarmac of the entire Leeds-Bradford superhighway!).

And the junctions in the town have been replaced with some very superficial hints at ‘shared space’ in roundabout form, a design that offers very little comfort to anyone cycling or walking. We saw an elderly lady hesitantly and very nervously attempting to cross the road here. To my mind a series of zebra crossings on the desire lines at the junction would be much more useful, and more beneficial to cycling too than the current half-hearted markings that are something of a free-for-all.

But really the problem is one of an excess of motor traffic – putting down nice, village-ish markings on what remains a very busy road won’t turn your town into a nice village, nor will it actually help people trying to get about within it on foot, or by bike. That motor traffic needs to be diverted onto the bypass, with access retained for residents and people visiting shops and properties.
More broadly, this fudge hints at some of the underlying problems with creating a high profile ‘route’ between two cities in a short space of time, given the inevitable problems of experience and expertise, combined with constraints imposed by councils unwilling to adversely impact drivers to even the slightest degree.
I came away from my visit to Leeds and Bradford with very mixed feelings. Positively, the route demonstrates that things can happen in other towns and cities across Britain, away from London, which attracts so much attention. Infrastructure can be built that will open up cycling as a mode of transport to people who might never have considered it. And there is at least now something established on the ground along these roads, good in places, bad in others, but something that can be improved upon.
On the negative side, the Leeds-Bradford cycleway demonstrates to me the need for clear, strong leadership in design, investment and implementation, to ensure that money being spent on cycling isn’t wasted on poor (and even dangerous) designs that will inevitably have to be fixed at a later date, as I suspect is true for a good deal of the route. It also demonstrates the need for clear political leadership at a national and local level, leadership that makes the case for modal shift, is willing to make tough choices in favour of it, and to face up to objections.











Even children could be seen cycling around with their helmets visibly discarded.
Including ones who were passengers.
This discarding of ‘safety equipment’ extended to the hi-viz bibs too, which were taken off and wrapped around handlebars…
… or pushed into baskets.


By the end of the day, the amount of neon yellow in the crowds of people cycling around had noticeably diminished (at least, that was my impression).
Maybe this shedding of helmets and bibs was, in part, due to Saturday being a reasonably warm summer’s day, the temperature prompting people to discard items that were making them hot.


And this kind of separated approach is of course universal in the Netherlands. The Dutch system of ensuring that roads without cycling infrastructure are only used by motorists for access purposes means that – even on these roads where cyclists aren’t physically separated – motorists aren’t held up, because there aren’t many other motorists to cause problems.











New developments have trees in them.
Older cycle paths are, of course, accompanied by street trees – you can usually date them by the age of the trees. A few decades old, in the examples below.

There’s a practical, pragmatic reason for much of this effort – trees help to shelter people walking and cycling from the elements, be it wind, or rain, or sun. A dense line of trees really does make a difference if you are battling a crosswind, and it can stop you getting sunburnt, as well as keeping the worst of the rain off you.













At the time of the ‘Traffic in Towns’ report in 1963, there were only 6.4 million cars in Britain, for a population of 54 million people. Of course, car use was growing, and may have continued to grow, even without any of the changes to the built environment that were occurring both before and after the Buchanan report. But I think it’s reasonable to point out that, essentially, you end up with the kind of transport use that you plan for. If you build very big roads in your towns and cities that make it easy to drive about, and difficult or inconvenient (or even dangerous and intolerable) to walk and cycle about, then we shouldn’t be surprised which mode of transport people decide to use for short trips.

